Pet Food Factory
A large-scale pet food manufacturing facility in Drury, built to support a highly automated production operation.
- Year
- 2022 - May 2024
- Location
- Bill Stevenson Drive, Drury
Industrial construction leads our work. Explore a delivery record across factories, commercial buildings and residential projects.
Industrial factories and factory conversions lead our delivery record, followed by commercial buildings, apartments, high-end residences and terrace housing, grouped by sector and sorted from newest project year to earliest.
Showing 9 of 34 projects
A large-scale pet food manufacturing facility in Drury, built to support a highly automated production operation.
A 2,500 m² extension to the Bill Stevenson Drive pet food factory, with OCL as Main Contractor. Construction began in October 2025 and is in progress.
Trade-waste treatment infrastructure for the Drury pet food factory. Stage 1 was completed in 2023, and Stage 2 was connected to the system in 2025.
A purpose-built, high-specification joinery manufacturing facility in Silverdale, delivered for Vistalite across 2020 and 2021.
An automotive parts factory project at 2 Mana Place in Wiri, Auckland.
A factory and warehouse project at 103 Kerrs Road in Wiri, Auckland.
An industrial workshop extension for aluminium joinery manufacturing, built with precast concrete panels and a steel roof.
A two-level concrete warehouse and canopy project for GMP Pharmaceuticals in East Tamaki.
A two-storey glass distribution facility with warehouse and office space, built with a precast concrete structure.
A complete new-build industrial warehouse delivered by OCL at 84 Lady Ruby Drive in East Tamaki in 2010.
The conversion of an established Glendene industrial building for food-factory and warehouse use, with OCL involved in adapting the existing facility.
The conversion of existing industrial space at 11 Dalgety Drive for aluminium manufacturing, with OCL participating in the factory conversion works.
Conversion work at Northern Arena, Silverdale's multi-pool swim school and fitness centre, with OCL involved in upgrading the existing facility.
A mixed-use hospitality project comprising motel accommodation and retail units, completed in Albany in 2020.
A four-level luxury design motel built with steel framing and concrete beside a major Auckland arterial route.
A three-storey additional motel building adjoining an existing accommodation block in Remuera.
OCL is responsible for the construction of Glencoe Apartment, currently in the preparation stage.
Apartment project shown in the original carousel as under construction.
A 16-unit Sandringham apartment project on a compact THAB site, delivered with an in-situ concrete structure and modern residential detailing.
Apartment project at 19 Ascot Avenue, delivered between 2019 and 2020, with project photography retained from the source site.
Six-storey apartment blocks with an indoor swimming pool, 55 residential units and 97 basement parking spaces.
A four-storey luxury apartment building positioned between Omahu Road and Great South Road, built with a precast structure.
A four-storey residential block completed in 2012 using dycore, ribs and hi-bond construction.
Three high-end residences in Campbells Bay, Auckland, constructed by OCL.
A five-storey Remuera residence with approximately 900 m² of internal floor area, constructed by OCL.
A Parnell residence with 353 m² of reported internal floor area, constructed by OCL.
A Parnell residence with a reported floor area of 309 m², constructed by OCL.
A rest home providing hospital care, with specialist fire protection, access and usability requirements.
Avondale Gardens Lifestyle Village project shown in the original Hospital Care and Rest Homes carousel.
A terrace-housing project in Stanmore Bay, with homes arranged along a shared internal access lane.
Block D of the West Edge master-planned development, comprising 21 three-storey terrace units on the former Crown Lynn Potteries site.
A medium-density terrace housing project completed in 2019 with practical site sequencing and quality controls.
A two-storey terrace development completed in late 2017 with an in-situ concrete structure.
A 16-unit, three-level residential project built in 2008 with precast concrete panels.