Infrastructure behind production.

The trade-waste treatment works support the pet food manufacturing facility on Bill Stevenson Drive in Drury. The first stage was completed in 2023, and the factory's second stage was connected to the system in 2025.

OCL's scope covered trade-waste pipework, foundations and associated civil works for the on-site infrastructure. Underground services and equipment bases had to be coordinated with the surrounding yard and existing buildings.

The 2025 connection linked the factory's second-stage works to the existing treatment system. The photographs show the finished treatment area alongside the siteworks and excavation carried out for that connection.